| |

Craxme.com

 Forgot password?
 Register
View: 1049|Reply: 1
Collapse the left

[Discuss] India’s first multi-modal terminal on inland waterways inaugurated in Varanasi

 Close [Copy link]
Post time: 13-11-2018 08:33:41
| Show all posts |Read mode

This is the first of the four multi-modal terminals being constructed on the National Waterway-1 (river Ganga) as part of the World Bank-aided Jal Marg Vikas project of the Inland Waterways Authority of India.


Prime Minister Narendra Modi on Monday inaugurated India’s first multi-modal terminal on the Ganga river in his parliamentary constituency here and received the country’s first container cargo transported on inland waterways from Kolkata.


The first consignment containing food and beverage had set sail from Kolkata in the last week of October.


The Prime Minister was accompanied by Uttar Pradesh Chief Minister Yogi Adityanath, Union Transport, Highways and Shipping Minister Nitin Gadkari and BJP State president Mahendra Nath Pandey, who is also the MP of the neighbouring Chandauli Lok Sabha constituency.


This is the first of the four multi-modal terminals being constructed on the National Waterway-1 (river Ganga) as part of the World Bank-aided Jal Marg Vikas project of the Inland Waterways Authority of India.


The total estimated cost of the project is ₹5,369.18 crore, which will be equally shared between the Government of India and the World Bank.


Earlier, upon his arrival here, the Prime Minister was given a detailed presentation of the waterways and watched a short film on the viability of the waterways between Varanasi in Uttar Pradesh and Haldia in West Bengal.


According to an official statement, the Centre’s Jal Marg Vikas Project aims at developing the stretch of the river between Varanasi and Haldia for navigation of large vessels weighing up to 1,500 tonnes to 2,000 tonnes.


Its objective is to promote inland waterways as a cheap and environment-friendly means of transportation, especially for cargo movement. The Inland Waterways Authority of India (IWAI) is the project implementing agency.


The project entails construction of three multi-modal terminals (Varanasi, Sahibganj and Haldia), two inter-modal terminals, five roll-on-roll-off (Ro-Ro) terminal pairs, new navigation lock at Farakka in West Bengal, assured depth dredging, integrated vessel repair and maintenance facility, differential global positioning system (DGPS), river information system (RIS), river training.



Source
Reply

Use magic Report

Post time: 13-11-2018 11:25:32
| Show all posts
awesome
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

Mobile|Dark room|Forum

16-6-2025 02:25 AM GMT+5.5

Powered by Discuz! X3.4

Copyright © 2001-2025, Tencent Cloud.

MultiLingual version, Release 20211022, Rev. 1662, © 2009-2025 codersclub.org

Quick Reply To Top Return to the list